Software > Manufacturers, Industry > Pharmaceutical Industry > wayRTS (Real Time Simulation)
wayRTS (Real Time Simulation)
APS wayRTS - Planning & control of the supply chain with any degree of automation

wayRTS (Real Time Simulation)

APS wayRTS - Planning & control of the supply chain with any degree of automation

Version:  5.3

 
 
 
 
 
 
 
 
Updated on 29. Jul 2024 by valantic Supply Chain Excellence GmbH
Demo version

Real-time production planning & control with the wayRTS APS software

The wayRTS APS software enables efficient and transparent production planning and control in real time for all stages of the value chain. Users benefit from the ability to adapt planning processes easily and to any degree of automation.

Thanks to the flexible, in-memory data structure of wayRTS, production processes can be modelled and seamlessly synchronized with other processes such as design or work preparation. The uniform data structure for different planning levels avoids disruptions and promotes the use of business management potential in the supply chain, such as high adherence to delivery dates and productivity with optimized throughput times and stock levels.

Advantages for your processes:

  • Improved adherence to schedules
  • Reduced planning and control costs
  • Increased productivity
  • Shorter throughput times
  • Optimized stock levels

Functions and process flow:

  • Real-time planning and scenario analysis
  • Automated planning support
  • In-memory technology for fast data processing
  • Real-time synchronization for optimization
  • Visual and interactive planning tools

The in-memory data storage of wayRTS ensures high-performance planning in real time, even with large volumes of data and complex production structures. This significantly increases efficiency in planning teams.

wayRTS combines automation, modern visualization and interactive real-time planning in a white-box APS approach. This approach combines optimization algorithms with the know-how of the planners, enabling transparent optimization and interactive interventions in critical situations. This significantly reduces planning and control tasks.

The core functions and technologies of wayRTS already meet the requirements of Industry 4.0 and support companies in their digital transformation.

Interfaces:

ERP-Lösungen
SAP

Target groups:

With valantic waySuite, companies can implement the entire Sales & Operations Planning (S&OP) process in real time and in one tool. Thanks to the real-time capability of waySuite, companies using it in make-to-order, series and variant production can very efficiently coordinate sales plans, production capacities and raw materials across all planning horizons. From automatic sales plan forecasts and detailed production planning to real-time availability checks in real time, waySuite enables full integration of all planning levels in one tool.

Contact information:
Explore more about the software:
Information
directly to the product website
Online demonstration
request meeting
Video appointment
directly to the product website
Success story
directly to the product website
Software exposé
request URL
Contact:
Send message

Screenshots

Functions (excerpt) of wayRTS (Real Time Simulation):

Collaboration
Collaborative Demand Planning, SCM
Collaborative Planning
Data acquisition
Detailed Planning
Forecasting
Forecasting and planning
Graphical disposition
Inventory check
Inventory management
Inventory update
Material cost planning
Monitoring functions
Order grouping
Order management
Order processing
Order status
Order tracking
Production control
Production planning
Project Management
Simulation
Stock lists
Supplier management
Supply Chain Intelligence
Supply Chain Management

Price

on request

Get to know the software better! Request a video appointment for a personal presentation!

Technical specifications:

Web-based:
yes
SaaS, Cloud:
yes
On-premises (local installation):
yes
Multi-user (network-compatible):
yes
Multi-client compatible:
yes
Maintenance:
included in price
Customizing:
possible for a fee
First installation (year):
2002
Number of installations:
200
Manufacturer based in:
Germany
Training:
included in price
Hotline:
included in price
Installation support:
included in price
Documentation:
Manual, Online Help, Demo version, Technical documentation
Dialogue language(s):
English, German
System requirements:
Compatible operating systems (runs with):
Win 11
Win 10
Win Server
Mainframe based
Unix based
Linux based
Mac OS
Mobile OSs (supports):
iOS
Android
Old Compatible Operating Systems:
Win 8
Win 7
Min. memory requirements:
8 GB RAM, 300 GB Hard disc
Data storage medium:
DVD
CD-ROM
Download
Flash memory

Software was recommended by SoftGuide in this IT projects:

Mechanical engineering company seeks APS system

Project no.: 18/1453
Tender until: finished

We are an internationally active mechanical engineering company in the machine and plant ... more

Austrian manufacturing and trading company seeks supply chain planning software

Project no.: 18/1235
Tender until: finished

We are a paper processing company and are looking for supply chain planning (SCP) software. ... more

Software for production planning and control wanted

Project no.: 15/186
Tender until: finished

We are looking for suitable software to simplify and optimize our processes. ... more

more IT projects