Software > Production, Procurement > Production Planning Systems > planeus – Digital Production Planning and Control
Cloud-based Production Planning and Control System

planeus – Digital Production Planning and Control

Cloud-based Production Planning and Control System
 
 
 
 
 
 
 
 
Updated on 29. Sep 2026 by th data GmbH
Demo version

planeus is the modern way of production planning and control. Intuitive, simple, in the cloud.

Developed with the latest web technology, all modules are available for PC, tablet and smartphone:

  • Planning: Orders are planned using an algorithm and displayed as planning objects on a clear Gantt chart. The Gantt chart contains different representations for projects, orders, and resource availabilities. Freely scalable, editable, and many more!
  • Dashboard: This individually configurable Dashboard shows the latest information at a glance. This allows planners to react immediately and in a targeted manner using KPIs, utilization graphs, or list views of current disruption in production.
  • Conflict radar: Showing instead of searching! Missing capacities or missed delivery dates? Our conflict radar alerts you as soon as conflicts arise. So you can save precious time and focus on what’s important.
  • Capacity utilization: Calculate and visualize your capacity usage. Keep everything in view: Available capacity vs. Capacity requirements per qualification.
  • Workbench: The Shop Floor Data Collection (SFDC) system. Simple and fast. On tablet, PC or smartphone. Intuitive and simple. No training necessary.
  • Reporting: Analyze your data with a single mouse click. E.g. target/actual comparisons, scrap quantities, reasons for faults. All easy to use and clearly arranged.
  • planeus TV: Your customizable display for the shop floor with a clear overview. Inform your employees about KPIs, current orders, malfunctions and much more.
  • Import: Use our extensive import functionalities. Manual import, automated import or ERP integration. planeus adapts to you individually.
  • Connecting your of external partners/suppliers

Choose from multiple editions to find the best solution for you.

Our formula for success for your company: Transparent production for each team member.

  • As a manager, you always have a clear overview of the production processes.
  • As a planner, you have effective production planning and control tools.
  • As a project manager, you can supervise your projects with foresight.
  • As a worker, you see all pending jobs and can report back orders.

planeus is available as both a cloud or on-premises solution.

Interfaces:

exact
MasterControl
Microsoft Dynamics 365
NetSuite
Open API
SAP
Tulip Interfaces
Unleashed
Weclapp

Target groups:

Medium and large manufacturing businesses with multiple editions tailored to you different needs.

References:

We work with a wide range of customers in the manufacturing industry, including Small to medium-sized businesses, as well as DAX corporations.

for example:

  • BMW Group
  • Thüringische Weidmüller GmbH
  • HellBa GmbH

Documents

Screenshots and Videos

 

Functions (excerpt) of planeus – Digital Production Planning and Control:

Barcode, RFID
Capacity planning
Changeover time
Control station
data aquisition
Delivery stops
Detailed Planning
ERP interfaces
External production with provision
External production without provision
Gantt charts
Graphical disposition
Inspection data acquisition
Integration of the control level
Job nesting
Key figures and key figure systems
Logistics
Machine Condition Monitoring
Machine control
machine inspections
Machine management
Maintenance time
Manufacturing Execution System
Material requirements planning
Measurement data
Operating orders
Order management
order-related personnel time recording
Planning
Process data tracking
Processing of order production lists
Product data
Production control
Production control station
Production controlling
Production order management
Production orders
Production planning
Production proposals, lot sizes
Production reports
Project planning
Project workflow
Quantity recording
Resource Management
Scenario planning
Simulation
Target setup detection
Task management
Time recording
Tool management
Visualization
Work order management
Work order planning
Contact information:
Ms. Manuela Nowak
Marketing
030/28 44 99 80
Explore more about the software:
Online demonstration
directly to the product website
Video appointment
directly to the product website
Success story
directly to the product website
Software exposé
request URL
Contact:
Send message

Get to know the software better! Request a video appointment for a personal presentation!

Technical specifications:

Web-based:
yes
SaaS, Cloud:
yes
On-premises (local installation):
yes
Multi-user (network-compatible):
yes
Multi-client compatible:
yes
Customizing:
on request
Manufacturer based in:
Germany
Training:
on request
Documentation:
Manual, Demo version
Dialogue language(s):
German
System requirements:
Compatible operating systems (runs with):
Win 11
Win 10
Win Server
Mainframe based
Unix based
Linux based
Mac OS
Mobile OSs (supports):
iOS
Android
Old Compatible Operating Systems:
Win 8
Win 7
Other requirements for soft- and hardware:
Server: Windows Server oder Linux (Detaillierte System für On-Premise übersenden wir Ihnen auf Anforderung) Client: Komplett Browser-basiert. Betriebssystemabhängig

Software was recommended by SoftGuide in this IT projects:

Swiss plastics company seeks software to manage its injection molding tools

Project no.: 25/3476
Tender until: finished

We are a small to medium enterprise (SME) in the plastics industry and are looking for new ... more

Solar technology manufacturer seeks capacity planning and personnel scheduling

Project no.: 23/3144
Tender until: finished

We are a solar technology manufacturer (series production) and are looking for software that ... more

Development and production company seeks production planning software (MES system)

Project no.: 23/3126
Tender until: finished

We are a development and production company (including motors, sensor technology, energy supply ... more

more IT projects

planeus – Digital Production Planning and Control is listed in the following categories