Software > Production, Procurement > Production Planning Systems > APS - Detailed Scheduling includes:
Software for optimized detailed planning and control of production

APS - Detailed Scheduling includes:

Software for optimized detailed planning and control of production
 
 
 
 
 
 
 
 
Updated on 02. Apr 2026 by SoftGuide
Demo version

APS - Detailed Scheduling creates an optimized, buildable and reproducible production program taking into account plant, personnel, material and tool availability. All steps from job creation to resource maintenance and scheduling are transparent for the planner. Bottlenecks or cost-intensive "trouble shooting" measures are thus avoided.

APS - Detailed Scheduling includes:

  • parameterizable algorithms for your individual requirements
  • transparent and user-friendly set of rules
  • system-supported creation of detailed production plans
  • simple, intuitive master and transaction data maintenance
  • fast validation of what-if analyses
  • planning consideration of production messages via an MES interface or mobile devices
  • simple scheduling and rescheduling thanks to drag-and-drop functionality
  • system-based decision support for conflicting targets during scheduling and rescheduling
  • integrated option for scheduling scheduled and undermined maintenance work
  • near-real-time processing of unplanned machine failures

APS - Detailed Scheduling adds value by:

  • reduction of manual planning effort
  • increase in productivity
  • transparency of work contents, machine assignments, processing times, employee and part requirements
  • improved customer communication thanks to scenario capability
  • software-as-a-Service offer guarantees agility and flexibility with low investment
  • structuring and archiving of planning and process know-how in the software

If required, APS - Detailed Scheduling can be individually adapted to your needs. Comprehensive support from the creation of the requirements catalog to the support of the schedulers in operational use guarantees a high level of investment security. Request a non-binding initial consultation now!

Target groups:

  • workshop finisher
  • variant manufacturer
  • machine and plant manufacturers
  • series producer
  • high volume manufacturer
  • vehicle supplier
  • electronics manufacturer

References:

We will gladly send you suitable references on request.

Explore more about the software:
Information
request URL
Video appointment
request
Success story
request URL
Software exposé
request URL
Contact:
Send message

Screenshots

Functions (excerpt) of APS - Detailed Scheduling includes::

Analysis functions
Batch size 1
Capacity planning
Changeover time
Control station
Critical production materials
Dashboards
Detailed Planning
ERP interfaces
Fine control
Gantt charts
Job nesting
Machine control
Maintenance time
Material requirements
Order grouping
Order management
Order status
Planning
Production control
Production order management
Production orders
Production planning
Scenario planning
Simulation
Statistics
Task management
Visualization
Work order planning

Price

on request

Get to know the software better! Request a video appointment for a personal presentation!

Technical specifications:

Web-based:
yes
SaaS, Cloud:
yes
On-premises (local installation):
yes
Multi-user (network-compatible):
yes
Multi-client compatible:
yes
Customizing:
possible for a fee
First installation (year):
2007
Number of installations:
auf Anfrage
Manufacturer based in:
Germany
Training:
for a fee
Hotline:
for a fee
Installation support:
included in price
Documentation:
Manual, Demo version, Technical documentation
Dialogue language(s):
English, German, French
System requirements:
Compatible operating systems (runs with):
Win 11
Win 10
Win Server
Mainframe based
Unix based
Linux based
Mac OS
Mobile OSs (supports):
iOS
Android
Old Compatible Operating Systems:
Win 8
Win 7
Win Vista
Win XP
Win 9x/ME
Data storage medium:
DVD
CD-ROM
Download
Flash memory

Software was recommended by SoftGuide in this IT project:

Solar technology manufacturer seeks capacity planning and personnel scheduling

Project no.: 23/3144
Tender until: finished

We are a solar technology manufacturer (series production) and are looking for software that ... more

more IT projects
4