Software > Programming > Programming Tools, Developer Tools > Gantt Control VCL
Gantt Control enables software developers to schedule tasks and events

Gantt Control VCL

Gantt Control enables software developers to schedule tasks and events

Version:  3.0

 
 
 
 
 
 
 
 
Updated on 22. Oct 2025 by Weise Software GmbH
Demo version

The component Gantt Control VCL enables software developers to visualize and schedule tasks, activities and events in their  own software applications in a flexible way. Gantt Control VCL is adaptable to different requirements and is applicable to most scenarios e.g:

  • Project management
  • Scheduling and task management
  • Production scheduling
  • Employee scheduling

Core components of the Gantt Control VCL are the gantt chart, the pert chart, the linked table view and a comprehensive printing preview.

The Gantt Control VCL component is available for the software development environments:

Delphi XE2, Delphi XE3, Delphi XE4, Delphi XE5, Delphi XE6, Delphi XE7, Delphi XE8, Delphi 10 Seattle, Delphi 10.1 Berlin, Delphi 10.2 Tokyo, Delphi 10.3 Rio, Delphi 10.4 Sydney, Delphi 11 Alexandria, Delphi 12 Athens und Delphi 13 Florence. Die Komponente lässt sich in 32bit und 64bit Windows-VCL-Anwendungen integrieren.

    Gantt Chart
    Within the gantt chart the chronology of activities and tasks is visualized as bars shown under a timescale.

    and features:

    • Different bar types to visualize planned activities and actual activities. It’s possible to apply a hierarchical structure to activities and group them into summary bars that allow collapsing and expanding of tasks.
    • Objects like milestones, textboxes and images can be displayed within the gantt chart.
    • Connections between two activities can be specified by parameters like the type of connection (start-finish, finish-start, start-start and finish-finish) or a minimal time range between two activities.
    • Buffer time, captions, start-, endpictogram, progress and view style can be applied for each single bar.
    • Bars can be easily moved by the user with drag&drop. New bars and connections can be created comfortable by “dragging them in” with the mouse.
    • The timescale supports the four different viewmodes “day-view”, “week-view”, “month-view” and “year-view”. Furthermore there are a lot of different options for labelling the time scale.
    • The integrated calendar modul supports defining and displaying categories for special dates like holiday or vacations. Predefined dates like weekends are already implemented.
    • The critical path, as the connection of activities that would reschedule the finish date of the project when delayed is calculated and displayed within the gantt chart.
    • All changes made to the data of the gantt chart can be recreated by using the integrated undo/redo mechanism.

    Pert Chart
    Within the pert chart the duration of a bar and its earliest start date, the earliest finish date, the latest finish date as well as the latest start date is visualized. Furthermore the pert chart enables structuring projects by modelling main project targets, sub-ordinate targets and work packages.

    Properties and features:

    • Activities of the pert chart can be connected to each other.
    • Activities of a gantt chart and a pert can share an identical data source. This means that all activities that are created in the gantt chart are visualized  automatically in the pert chart.
    • Activities can be easily moved per drag&drop. New activities can be created by “dragged them in” with the mouse. A magnetically raster enables a clear arrangement of activities.
    • All changes made to the data of the pert chart can be recreated by using the integrated undo/redo mechanism.

    Table View

    For each gantt chart and pert chart an editable table view is available, storing any additional necessary information..

    Properties and features:

    • The tree-like structure of the table nesting, collapsing and expanding single rows.
    • User defined columns and rows can be added or deleted at runtime.
    • For displaying and editing the information stored within the table a lot of different data type editors are supported e.g. (single line text editor, multi line text editor, date editor, time editor, combo box, image combo box, currency edit field, spin edit field and single line text editor linked to a button).
    • By clicking the header of a column, an ascending or descending sort order can be applied.
    • Within one nesting level, rows can be swapped per drag&drop. The row height can be changed independently and interactively for each row with the help of the mouse.
    • Various options for formatting the table are available. For each row the height, the colour and the text font are applicable. Highlighting single rows is as easy as pie.
    • All changes made to the data of the table chart can be recreated by using the integrated undo/redo mechanism.
    • The predefined column “number” provides the two numbering modes hierarchically and continuously.


    Printing preview

    The powerful printing preview provides the professional presentation of your charts and data.

    Properties and features:

    • A legend can be added to a gantt or pert chart. By adding and formatting columns and rows to the legend the user’s requirements are met. For each legend cell the content (text or image) can be specified.
    • Multipage printing, fitting to pagewidth, defining a title, page header and footer, applying a background image allows high adaptability to fulfil specific requirements.
    • Within the printing preview the layout of the page header and page footer can be defined interactively. Autotext fields like “current page number” or “date” can be inserted
    • Settings can be stored to a printing profile.
    • Page borders can be adjusted with the mouse
    • A thumbnail view provides intuitive navigation between different pages.

    Target groups:

    software developer

    References:

    netstyle Informationstechnik GmbH Netphen Germany
    Effective Software LTDA Caxias do Sul Brazil
    Logyplan Prilly

    Suisse

    AMPER PROGRAMAS Getafe Espana
    Schuchert Managementberatung GmbH & Co. KG Bochum Germany
    Bern Suisse
    ISSENDIS Annecy Cedex 9 France
    ES 2000 Errichter Software GmbH Osnabrück Germany
    Wisetime Oy Oulu Suomi
    Sodecia SGPS, S.A. Maia Portugal
    Foundation Software Brunswick USA/OH
    SARL Infocob Les Sables d'Olonne France
    Meier IT Pty Ltd. Mount Crosby Australien
    Zaklad Elektronicznej Techniki Olsztyn Poland
    Schroeder & Associes S. A.  Germany Germany
    Ingenieurbüro Viersen Germany
    Vammala Suomi
    FRANCISCO SARABIA MATEOS L'Alcudia, Valencia Espana
    Berlin Germany
    BMS Creative Liszki Poland
    Softwareentwicklung Hartmannsdorf Germany
    FCCA Oranjestad Aruba
    TSS Logistik GmbH Ennepetal Germany
    Jürgen Michaelis Jm-Bausoft Winnenden Germany
    Packeiser Systemhaus GmbH Seesen Germany
    Mitan Wirtschaftssoftware AG Sömmerda Germany
    PROCFIT Santos Brazil/ SP
    Dilner International Ltd. Belize City Belize
    Bruesa Construccion San Sebastian Espana
    acadGraph CADstudio GmbH München Germany
    Digital Art Division Warszawa Poland
    Innovate GmbH Naumburg Germany
    Object Solutions Software AG Merlischachen Schweiz
    CADCAM Partners BIS Gliwice Poland
    Bühler CZ s.r.o. Zamberk Czech Republic
    ERP Software Ashmore Queensland 4214 Australia
    IT Applications Department GUD Holdings (Pty) Ltd. Isipingo Beach 4115 South Africa
    ES-SYSTEM SA Krakow Poland
    INFORM GmbH Aachen Germany
    acadGraph CADstudio GmbH Velen Germany
    AnySoft.pl Rejestracja Oprogramowania Milanowek Poland
    Hexacom GmbH & Co. KG Löningen-Bunnen Germany
    Contact information:
    Mr. Michael Unglaub
    03 51 - 87 32 15 00
    Explore more about the software:
    Information
    directly to the product website
    Software exposé
    request URL

    Functions (excerpt) of Gantt Control VCL:

    Calendar functions
    Capacity planning
    Construction scheduling
    Construction time management
    Data visualization
    Database
    Gantt charts
    Graphical disposition
    Milestones
    Monitoring functions
    Network plan
    Network plans
    Problem management
    Production planning
    Production reports
    Project Management
    Project planning
    Project workflow
    Report management
    Resource Management
    Role-based reporting
    Scalability
    Scheduling
    Structure plan
    Time planning

    Price

    from 599.00
    EUR
    plus 19% VAT
    once
    License per developer

    Technical specifications:

    Web-based:
    no
    SaaS, Cloud:
    no
    Multi-user (network-compatible):
    no
    Multi-client compatible:
    no
    Maintenance:
    for a fee
    First installation (year):
    2007
    Manufacturer based in:
    Germany
    Training:
    for a fee
    Hotline:
    included in price
    Installation support:
    not required
    Documentation:
    Demo version, Technical documentation
    Dialogue language(s):
    English, German
    System requirements:
    Compatible operating systems (runs with):
    Win 11
    Win 10
    Win Server
    Mainframe based
    Unix based
    Linux based
    Mac OS
    Mobile OSs (supports):
    iOS
    Android
    Old Compatible Operating Systems:
    Win 8
    Win 7
    Win Vista
    Win XP
    Win 9x/ME
    Data storage medium:
    DVD
    CD-ROM
    Download
    Flash memory
    Other requirements for soft- and hardware:
    geeignete Entwicklungsumgebung (Microsoft Studio, Delphi oder ActiveX)

    More software of the manufacturer:

    Bildverortung
    Construction diary
    Escape Plan
    Smart-Check
    E-Invoicing